by Burke Construction Group | Mar 26, 2019
Matter Logistics Center @ West Cheyenne is located in the thriving North Las Vegas Airport sub-market. The first phase of this project included 727,926 square feet of light distribution space, providing a new location for industrial users in an under-served area. With close proximity to North Las Vegas Airport and 5 miles to the Las Vegas Strip, the site serves many different distribution and tourism industries including manufacturers. A modern design paired with high functionality differentiates Matter Logistics Center @ West Cheyenne and brings highly sought after product to both new and existing businesses.
by Burke Construction Group | Mar 24, 2019
Matter Craig Corporate Center is a 155,790 square foot concrete tilt-up industrial building with divisibility to 36,450 square feet. This project includes 28 loading docks, 4 grade level loading entrance ways and 5 storefront entry locations complete with canopies, ESFR sprinklers, 30’ clear height and 54’ x 55’ typical column spacing. The building also has prismatic skylights, SuperNeutral Low-E glass and R30 Insulation to maximize energy savings.
by Burke Construction Group | Mar 24, 2019
Christie Lites is a 155,000 square foot office and warehouse tenant improvement. This project consisted of two cloud ceilings, the first cloud is completely suspended approximately 26′ in the air and the second is semi-floating while attached to the back wall, which creates a waterfall/cascade effect with 90 degree LED lighting. Additionally, the warehouse buildout included five large fans that span the length of the building that will move and condition the air in conjunction with the 28 evap coolers for the 28 new dock levelers.
by Burke Construction Group | Mar 14, 2019
The modernization and enhancement of an existing 180,000 square foot warehouse into a distribution center for Bed, Bath & Beyond which included a two-story administrative office, receiving and shipping department as well as a wrapping/shipping platform. This project also consisted of the demolition and construction of new dock levelers and equipment as well as the installation of all new mechanical, electrical and plumbing systems.
by Burke Construction Group | Mar 12, 2019
The Frito Lay Las Vegas DC Expansion project included a 30,000 square foot expansion of the existing warehouse facility. This expanded space utilized tilt-wall panel construction similar to the existing building. The existing concrete tilt-wall building was designed with a metal panel exterior wall section and the expansion will connect to the existing building along this elevation. This new expansion functions with the pre-existing facility as one common warehouse space.
2016 Safe Site Award
July
AGC – Las Vegas