by Burke Construction Group | Mar 24, 2019
The Cashman Equipment HQ 55-acre site is laid out as a campus with 7 separate buildings – each housing a separate operation of the facility. The seven buildings include Power Solutions/EPG, Cat Rental Store, Weld Shop, Dyno Shop, Administration, Warehouse and Equipment Shop. The facility had to conform to Caterpillar Corporate Design Guidelines and the owner’s desire “to be as sustainable as possible.” Sustainable features include a ground source heat exchange for HVAC, daylight in 90% of regularly occupied spaces, daylight harvesting (with associated building controls), waterless urinals, low-flow fixtures, occupancy sensors, native landscaping, and recycled and local materials. This project was certified LEED Gold, won multiple NAIOP awards as well as ENRSouthwest Best Green Building award in 2009.
2011 Spotlight Award
Sustainable Impact
NAIOP – Southern Nevada
2009 Spotlight Award
Office Building Interiors
NAIOP – Southern Nevada
2009 Spotlight Award
Special Purpose Industrial
NAIOP – Southern Nevada
2009 Contractor Award
Best Green Building
ENR Southwest
by Burke Construction Group | Mar 16, 2019
Bluepoint Solutions featured a 13,580 square foot tenant improvement on the second floor of a Class A office building. Improvements included a complete HVAC system, fire sprinklers & alarm system, audiovisual, security systems as well as a complete office improvement build-out. Unique vintage style architectural design features and sustainable elements were incorporated throughout the project.
2013 Spotlight Award
Merit Award – Business IT Ecosystems
NAIOP – Southern Nevada
2012 Safe Sight Award
April
AGC – Las Vegas
by Burke Construction Group | Mar 16, 2019
In 2012 we completed a 13,132 square foot tenant improvement which consisted of interior design, framing, electrical, mechanical and plumbing finishes as well as extensive security upgrades. In 2016 we completed an 8,058 square foot expansion for William Hill Gaming. The expansion included demolition to part of the existing suite as well as the suite receiving all new flooring, HVAC, interior walls, ceiling, electrical, doors and paint.
by Burke Construction Group | Feb 20, 2019
This project consisted of a 300,000 square feet ground up integrated resort, which includes a swimming pool, kiddie pool, 700 car parking garage as well as two waterfalls and over 2,000 tropical plants. In addition to the new construction, this project consisted of a casino and conference center expansion as well as banquet kitchens, two full-service restaurants, employee dining area, offices and more. This project also included the installation of a 1350 ton central cooling plant and a mezzanine mechanical area for new HVAC equipment.
by Burke Construction Group | Feb 20, 2019
The Ulta at Town Square project included the interior shell buildout of ULTA cosmetics, a 14,809 square foot retail space. The scope included the pour of the first-floor concrete slab, fill-in of the second floor open areas in the front and back with A structural steel deck and pour. Additional scope included the installation of a new independent electrical power source with a new transformer and switchgear as well as four new HVAC units that will service the first floor. Additionally, a new entrance foyer was built in the back for second-floor access.