by Burke Construction Group | Feb 20, 2019
A 5,500 square foot organic heirloom coffee caffé tenant improvement. This space includes handmade ceramic tile fountains as well as a unique star-shaped skylight component which will compliment features of the shopping plaza. This project also included food preparation equipment and storage on the bottom floor of the facility.
by Burke Construction Group | Feb 20, 2019
The 64,000 square-foot Corporate Circle Call Center project was broken into three phases. The first phase of the improvements consisted of extensive refurbishment to existing finishes as well as minor MEP improvements. The second phase required an overhaul of the main building gear, complete sound-masking systems throughout, furniture renovations, extensive electrical improvements, new CRAC units, and UPS power systems. The third phase involved an extensive 27,800 square foot remodel with a full kitchen as well as modifications to obtain LEED certification.
by Burke Construction Group | Dec 30, 2018
The Sykes Call Center is located in the Cheyenne Corporate Center and acts as technical support for the Sony Customers. The scope of this project included the complete demolition of an existing 43,000 square foot tenant improvement. The new space included a new UPS system, state of the art lighting package, extensive tenant specified vinyl branding and a 1,100 square foot cafe/break area. A unique feature of this project was the use of 3form wall panels hung from airplane cable.
by Burke Construction Group | Dec 30, 2018
This 64,000 sq. ft. call center was built for Barclaycard US. The first phase of improvements consisted of extensive refurbishment to existing finishes including carpet and paint as well as minor MEP improvements. The second phase required the massive overhaul of main building gear, complete sound-masking systems throughout, furniture renovations, extensive electrical, low voltage, new CRAC units, and UPS power systems so that mission-critical systems never ceased. The final phase involved an extensive 27,800 sq ft remodel with full kitchen/ café and modifications to obtain LEED certification. The project required phased scheduling and the ability to meet specific milestone dates for ribbon-cuttings, employee training schedules, and project turnover.
2015 Spotlight Award
Large Tenant Improvement
NAIOP – Southern Nevada
2015 Safe Site Award
August
AGC – Las Vegas
2014 Economic Development Award
Project of the Year
City of Henderson